TESTIMONIALS
"London Demo were employed by Meredith Street Investments for a category A office refurbishment in EC1 London to carry out and manage all aspects of the construction and demolition work. Which comprised of a full strip out and refurbishment of 10 individual commercial units into one open plan office over two floors basement and ground encompassing 4,897 sq ft. The standard of works was very high. Sub-contractors were well managed appropriately implementing health and safety to a high standard as well as delivering the project on time and in budget. On the whole, we were pleased with the overall conduct of London Demo and would certainly work with them again in the future."
Nolan Watson – Neptune Group
"Prior to works being carried out, the quoting process was quick and availability was confirmed. It was a push getting the RAMS across in time to meet Network Rail supplier time limits. The works on site were fantastic, the health and safety of the operatives was good and they ensured no dust could escape the area upon removal of the paint. The condition of the surface after the paint was removed was also very good as it meant our limits on power tools to finish the surface wasn't as much a problem as anticipated "
Andrew Mercer, Instrumentation & Monitoring Engineer – AECOM
"London Demo worked with us at Bulb to deliver a strip out and renovation project that was on time and under budget. Their team were professional, knowledgeable and very amenable to changes as the project progressed. Communication throughout was excellent and we're very happy to have worked with them and look forward to working with them again in the future."
Sam Cuthbert, Facilities and FOH – BULB Energy
"London Demo worked tireless throughout all floors, including weekends and the Christmas period, to ensure floors were handed back to us in a suitable condition for others to work. Health and safety was excellent from start to finish involving quick organisation of blood lead level checks for all operatives, face fit tests for full face respirators and demountable DCU’s. Air monitoring and samples were arranged to ensure full compliance."
Shaun Shea, Site Manager – Kier Western & Wales
“London Demo have carried out many aspects of work across the Television Centre and White City Place over the last 4 years. These works have varied from reactive maintenance to a complete fit out. The versatility and reaction time London Demo have provided whilst working on the estate has been nothing but reassuring. We look forward to working with London Demo on future projects."
Fritz Jansen, Estate Director – Television Centre
call us on 020 7993 6222 for your free no obligation quotation or to discuss any aspect of your project
"When schemes have inevitability changed part way, for tenant request or other reasons, London Demo have always been very flexible and accommodating. We use and continue to use London Demo on a range of our schemes and have no hesitation in recommending them to you."
Nick Hiles, Asset Management Director – Stanhope PLC
"I am very happy to take the opportunity to recommend T&T Group. The service of works carried out at Gordon House Studios were completed to high specification, communication and attention to detail showed throughout the project. All documentation was issued correctly and in a timely fashion. As a company we will not hesitate to use T&T Group on further projects."
Matt Freeman, Project Manager – Contrakt Ltd
"London Demo were tasked with out-of-hours lead paint removal work at the land mark Tea building in the heart of Shoreditch. London Demo lead paint removal teams worked tirelessly to deliver the project in time for the New Year. These works comprised of abrasive blasting to concrete columns, brick walls and concrete beams in confined blasting tents. The standard of work was very high, and the desired finish was achieved. Health and safety implemented was to a high standard throughout the project. We will most certainly carry on working with London Demo on upcoming projects in the near future. Not only for their specialist lead division but also for their strip-out and demolition."
Alf Macenka, Contracts Manager - TTP